PROJECT OVERVIEW
Description:
The 10,000+ capacity stadium was completed in 2017 at a cost of about $26.6 million. The open-air, horseshoe design stadium included a premium skybox section, Club section sitting, enclosed press box, highly visible video board, and easy viewing mid-field seating. Adjoining the stadium was the construction of a nearly 4,000 vehicle parking lot.
GEOServices Services:
GEOServices provided Construction Material Testing and Special Inspections related to site grading and stadium construction.